CAPSTONE Standardized CHP Micro Turbines Power Generation Units
Type | Output Electric | Connection | Fuel | Cogeneration | Trigeneration | |||||||
kW | Grid | Island | Dual | Natural Gas | Bio Gas | Diesel | Landfill | LPG | Digester | CHP | CCHP | |
C 30 | 30.00 | yes | yes | yes | yes | yes | yes | yes | yes | yes | yes | yes |
C 65 | 65.00 | yes | yes | yes | yes | yes | yes | yes | yes | yes | yes | yes |
C 200 | 200.00 | yes | yes | yes | yes | yes | yes | yes | yes | yes | yes | yes |
C 400 | 400.00 | yes | yes | yes | yes | yes | yes | yes | yes | yes | yes | yes |
C 600 | 600.00 | yes | yes | yes | yes | yes | yes | yes | yes | yes | yes | yes |
C 800 | 800.00 | yes | yes | yes | yes | yes | yes | yes | yes | yes | yes | yes |
C 1000 | 1000.00 | yes | yes | yes | yes | yes | yes | yes | yes | yes | yes | yes |
CALNETIX Standardized CHP Micro Turbines Power Generation Units
Type | Output | Connection | Fuel | Cogeneration | Trigeneration | |||||||
kW | Grid | Island | Dual | Natural Gas | Bio Gas | Diesel | Landfill | LPG | Digester | CHP | CCHP | |
Cal 100 | 100.00 | yes | yes | yes | yes | yes | yes | yes | yes | yes | yes | yes |
For detailed information (PDF files) click the CHP unit type from the first column.
The CHP and CCHP units can be installed in clusters (2 up to 10 units), either from start up, either as power upgrade.
The ORC unit can be install in series with the CHP and CCHP units using them waste heat, increasing the overall efficiency.
The CHP and CCHP units can be instaled together with a boiler for incresing the overall efficiency.
For power outputs larger than 2 MW we provide alternative integrated solutions for power plants based on: turbines, combustion engines, combined cycle.